When we buy a machine and go back, we need to understand its installation, but before installation, we need to understand the precautions for its installation, because the installation of the machine is not as simple as we think, but Please professional is the master, but also pay attention to the installation environment is appropriate, Dongguan glass edging machine is the same, then what are the precautions for installing Dongguan glass edging machine?
The installation of the glass edging machine needs to ensure that the ground is level. After installation, the angle of each angle of the machine should be guaranteed, otherwise the processing effect will be affected. Ensure that the power is correct, such as foreign special industrial voltage 415V/50HZ, 220V/50HZ, 220/60HZ. If the power is wrong, it may cause the motor on the edging machine or the electrical appliance in the electric cabinet to burn. The glass edging machine works under the condition of water supply, and the customer should judge whether the water supply amount of the floor water tank of the factory is sufficient according to the processing amount of the factory. After the glass edging machine ensures that the installation is completed correctly, the processing work can be carried out, strictly in accordance with the instructions and the processing flow, so as to avoid unnecessary generation. Secondly, we must ensure timely maintenance. This step is also the only way to extend its service life.
The above is an introduction to the precautions for installing the Dongguan glass edging machine, I hope to be helpful to you.
Previous:Pay attention to the maintenance of the automatic glass edging machine
Next:Already the last article